UPS & Power Suppliers in Dubai, Sharjah & Abu Dhabi

We supply, install and maintain single and three phase UPS systems, replace batteries before they fail, and audit power so your equipment rides through every outage.

CoverageDubai, Sharjah, Abu Dhabi
PricingFixed, in AED
BatteriesTested on site

Free power audit

We check your UPS load, batteries and runtime.

Or call +971 56 690 6916

A UPS with tired batteries fails exactly when the power does. Most never get tested until then.

Single or three phase?

Single phase suits racks and small server rooms. Three phase suits data centres and large loads.

How long do UPS batteries last?

Typically a few years, less in hot rooms. Testing tells you before they fail.

Do you maintain UPS units you didn't supply?

Yes. We take over maintenance and battery replacement for existing units.

What each service covers

Supply is the start. Testing and maintenance keep the power on.

NeedSingle phase UPSThree phase UPSBattery replacementMaintenance contractPower audit
Protect a rack or small roomIncluded
Protect a data centreIncluded
UPS beeping or failing testsIncludedIncludedFinds cause
Know your real runtimeIncludedIncluded
Planned preventive visitsIncluded

Supply and install

UPS systems sized to your load and runtime, supplied through official channels and installed by our engineers.

  • Load and runtime sizing
  • Installation and testing
  • Network monitoring cards

Batteries and maintenance

Battery testing and replacement, firmware and preventive visits under contract.

  • Battery testing
  • Battery replacement
  • Preventive maintenance

Our advice: test UPS batteries at least once a year. Heat in UAE server rooms shortens their life.

Engineer testing UPS batteries with a multimeter

How a power audit runs

  1. Measure Power engineer

    We measure load, phase balance and the runtime you actually have.

  2. Test Power engineer

    We test batteries and check UPS logs and alarms.

  3. Recommend Power engineer

    You get a clear report: replace, resize or keep.

  4. Maintain Your named team

    Preventive visits and replacements under contract.

What affects the cost

Load and runtimeDrive the size of UPS and number of batteries.
Single or three phaseThree phase systems cost more and protect more.
Maintenance levelVisit frequency and response time affect the annual fee.

Questions we're asked

Can you replace batteries without shutting down?

On many models, yes, using hot-swap battery packs or bypass mode.

Do you dispose of old batteries?

Yes. Old batteries are collected and sent for proper recycling.

Can the UPS shut servers down safely?

Yes. We configure network shutdown so servers close cleanly during a long outage.

Engineer checking a data centre on a tablet

Find out if your UPS will hold

Book a free power audit with a UAE engineer.